Water Management-Ongoing
1.RCC Pipe Carrying Bridge Work, Thanjavur Construction of RCC pipe carrying bridge across Colleroon river, construction of 8 lakh litre and 2 lakh litre elevated reservoir & providing pumping main & distribution system in Thanjavur Municipality Value: 1116.34 LakhsClient: The Commissioner, Thanjavur Municipality, Thanjavur.
|
2.Irrigation Works, Kannadian Anicut, Thoothukudi Improvements to Existing Kannadian Anicut across Tamirabarani river under the Formation of flood carrier canal from LS 6.50 Km of existing Kannadian channel to drought prone area of Sathankulam, Thisaiyanvilai by interlinking Tamirabarani, Karumeniyar and Nambiyar rivers in Tirunelveli and Thoothukudi Districts of Tamilnadu Value: 495.75 LakhsClient: The Executive Engineer, PWD/WRO, Tamiraparani Basin Division, Tirunelveli-2
|
3.Irrigation Works, Thoothukudi Widening of Existing Kannadian Channel from L.S 0 to 2150 M under the Formation of flood carrier canal from LS 6.50 Km of existing Kannadian channel to drought prone area of Sathankulam, Thisaiyanvilai by interlinking Tamirabarani, Karumeniyar and Nambiyar rivers in Tirunelveli and Thoothukudi Districts of Tamilnadu. Value: 436.77 LakhsClient: The Executive Engineer, PWD/WRO, tamiraparani Basin Division, Tirunelveli-2
|
4.TWAD Board, Cuddalore Providing CWSS to 54 Quality affected and 67 Wayside Habitations in Kumaratchi & Parangipettai Unions and to Killai town Panchayat in Cuddalore District Value: 1504.14 lakhsClient: The Executive Engineer, TWAD Board, RWS Division, Cuddalore
|
5.Storm Water Drainage Work, Velacherry for Chennai Corporation. Providing, re-sectioning and Concrete lining to Raj Bhavan Canal including fencing and other improvement works and construction of Storm water drain work in Velachery Water Shed, Chennai city Value: 4182.88 LakhsClient: The Commissioner, Corporation of Chennai, Ripon Building,Chennai - 600 003.
|
6.Storm Water Drainage Work, Kolathur for Chennai Corporation. Construction of storm water drain work in Kolathur Water Shed, Chennai city Value: 2252.23 lakhsClient: The Commissioner, Corporation of Chennai, Ripon Building,Chennai - 600 003.
|
7.Storm Water Drainage Work, South Buckhingham Canal for Chennai Corporation. Construction of storm water drain work in South Buckhingham Canal Water Shed, Chennai city Value: 3443.79 LakhsClient: The Commissioner, Corporation of Chennai, Ripon Building,Chennai - 600 003.
|
8.Flood Protection Works, Cuddalore Flood Protection works in Left Bank of Kollidam (Coleroon) river from L.S. 126.96Km to 135.21Km in Kattumannar Koil Taluk of Cuddalore District in TamilNadu. Value: 1450.00 LakhsClient: The Superintending Engineer, PWD WRO, Vellar Basin Division, Cuddalore.
|
9.Pipeline Works, Mangalore Pipeline Corridor and Road for MSEZl Reach I (0 to 50 km and 1.73 to 1.80 km) Value: 3257.72 LakhsClient: Mangalore Sez Limited, Third Floor, MUDA Complex, URWA Store, Ashok Nagar, Mangalore - 575006, Karnataka
|
10.Formation if Tank, Dindigul District Formation of Tank across Nallathangal Odai near Kothayam village in Oddanchatram Taluk of Dindigul District Value: 555.17 LakhsClient: The Executive Engineer PWD,WRO, Nanganjiyar Basin Division, Palani
|
11.Irrigation Work, Contour Canal -I Rehabilitation of Contour Canal from L.S. 0.000 KM to 11.480 KM Value: 5990.00 LakhsClient: The Executive Engineer, PWD/WRD, Parambikulam Division, Parambikulam
|
12.Irrigation Work, Contour Canal -II Rehabilitation of Contour Canal from L.S.30.100 KM to 49.300 km Value: 6010.00 lakhsClient; The Executive Engineer, PWD/WRD, Thirumurthi Division, Udumalpet.
|
13.Flood Protection Work, Cuddalore Dist Permanent flood protection works to manimuktha river from paravalur to Gudaliyathur ( L.S 46.10 km to 75.00 km) in cuddalore District. (pack 12) Value: 962.85 LakhsClient: The Executive Engineer, WRD,Vellar Basin Circle, Vridhachalam
|
14.Flood Protection Works, Paravanar River, Cuddalore Formation of flood bank and improvind drainge facilities to middle paravanar river in cuddalore District. (pack 18) Value: 688.14Client: The Executive Engineer, WRD, Coleroon Basin Division, Chidambaram
|
15.Shore Protection Works, Andaman (OVERSEAS) Construction of Sea Wall/Shore Protection work at Mus, Car Nicobar (800 Mtrs). Phase I Value: 1803.45lakhsClient: The Executive Enginner, Construction Division, APWD, Car Nicobar.
|

Home
Contact 