Pykara Hydra Electric Project

1.Pykara Ultimate Stage Hydro Electric Project (3X50MW) - TNEB - Masinagudi
  • Under Ground Thermal Power House with 3 Units of 50MW each Total of 150MW.
  • Construction of Machinery Hall with Circular and Conical Type of shuttering.
  • Total Quantity of Concrete laid about 25000Cum
  • Fabrication of Structural Steel works for Superstructure of the Power House about 2650MT.

 

Sea Water Intake Pump House, Udupi

2.Sea water Intake Pump House for 2x507.5 MW Udupi Thermal Power Plant at yellur Village, Karnataka.

Highlights:

  • Work involves 10,500 Cum of RCC M30 and 2300MT of Reinforcement Steel.
  • Dewatering using multistage well point system.
  • Completed with a span of 6 Months.

 

RTPP Stage II, Kadappa

3.General Civil Works for Power House Super Structure, ESP Control Room, BCW Pump House, Cable and Pipe trenches works of 2x210 MW ar RTPP Stage II, V.V.Reddy Nagar, Kadappa Dist

Highlights:

  • Roof Height is bout 150 Feet.
  • Total Qty of Concrete about 24000Cum

 

Coal Based Captive Plant

4.1X25MW Coal Based Captive Plant Phase II for M/s. Madras Aluminium Company Ltd., under EPC Contract of M/s. BGR Energy System Ltd., Chennai

Highlights:

  • STG Building RCC Framed structure up to 26mtr elevation.
  • T.G. Foundation, ID Fan, FD Fan, PA Fan and auxiliary foundation
  • Boiler House Building ESP Foundation
  • RCC Cooling tower 3 shells
  • RCC Ash Silo
  • ESP and Cooling Tower control room

 

Captive Power plant, Mettur Dam

5.Civil Structure & Architectural works for 2x25 MW Captive Power Plant for Chemplast Sanmar Ltd., Mettur Dam under EPC Contract of M/s. Thermax International Ltd., Pune.

Highlights:

  • STG Building RCC Framed structure up to 26mtr elevation
  • Boiler House buildings
  • Turbine Generator Foundation
  • Major Item of works involves RCC 15,000Cum, Form work 1,25,000Sqm
  • ESP, ID, FD Fan Foundations and other auxiliary foundation.
  • MCC Rooms
  • DM Water system Coal Handling  Systems, Pipe Rack Foundations
  • RCC Ash Silo 225M Height
  • RCC Frame of 14M elevation for ACC
  • Infrastructure works Road, Storm Water Drain, RCC Culverts

 